Description:
Design/Build effort to address fire damage resulting from the Sept. 11, 2001 terrorist attack to the Pentagon. Phase 1 involved damage assessment, temporary stabilization, and weather protection and Phase 2 involved roofing redesign and system restoration. The new system was specially designed with internal fire-stops limiting potential damage in the future, while using materials to match the original construction.
Architect: OPX
Size: 70,000 SF
Schedule: 9 months