Description:
This four-level, 400-space parking garage was built with brick veneer and cast stone to enhance the garage and blend in with the nearby buildings. A 150-foot pedestrian bridge connects the second level of the garage with the second floor of the hospital to avoid visitors and staff being exposed to bad weather. A security booth with CCTV monitors for surveillance of the parking garage and outdoor parking areas are located on the top level of the garage.
Architect: Wilmot Sanz
Size: 70,000 SF
Schedule: 10 months
Sustainable building practices. Energy efficient solutions. Recycling programs. Projects we can be proud of.
Join our email list to receive the latest news and updates from Forrester Construction.