Description:
This new two-story facility is specially designed to accommodate national competitive swimming and diving events, as well as instruction and recreational activities. The project included the construction of a competition pool, recreation pool, leisure pool with water slides and dramatic water features, and two separate hydrotherapy pools.
Architect: Hughes Group Architects
Size: 63,000 SF
Schedule: 17 months
Awards:
Washington Building Congress Craftsmanship Awards
(Two Awards)
MD/DC NAIOP Award of Merit
MidAtlantic Construction Award
Sustainable building practices. Energy efficient solutions. Recycling programs. Projects we can be proud of.
Join our email list to receive the latest news and updates from Forrester Construction.